Success Case

Aotto

Building the first brand in stamping automation line

Contact Us
Phone:0531-86521778
0531-86521788
Fax:0531-86521797
E-mail:sales@aotto.cn
Address:355 Huade Road, Economic Development Zone Jinan City
Location: Home > Success Case
  • On 28 September 2015, Zotye auto Jiangsu Jintan intelligent manufacturing base officially completed and put into operation, also all the Taidamai the first paragraph high-quality SUV all the Taidamai X5 in Jintan base full offline. The government of Jiangsu Province, Changzhou Municipal Committee, Zotye Group Chairman, dozens of media, financial institutions, suppliers representatives and construction units...
  • Yizheng Shen Wei stamping A line by the J47-1250/2000 (1 units), JA39-1000 (4 units) and 2400 tons of tons of hydraulic pressure machine, an old plant from Yizheng to the mass industrial park. The transformation includes all electric control, lubrication, gas road, working platform, protection, increase 200 tons of air cushion (5 units), the replacement of 160 tons of air cushion (5 units)...
  • FAW Die Manufacturing Co., Ltd. overall relocation, a relocation Jinan Erji double acting 1300 tons (1) + double 400 tons (3); two relocation Ji 800 tons of 1.24 (Taiwan); three relocation day forging Double Action Hydraulic Press 2000 tons (1) + 1000 tons (3). The relocation project includes all electronic workbench, mechanical press...
  • Dongfeng Russia 6300 tons press overhaul: Dongfeng Russian 6300 tons of press is the largest mechanical press. Our company for the clutch, brake and model repair, the main drive of all copper tile, bearing, replacement, repair of the eccentric body; all the main motor and electric control system...
  • Dongfeng Fengshen Xiangfan Russian press overhaul, four point 800 tons a, four 500 tons of two, four 1000 tons a, press electrical system replace all replace all bearings, high-speed shaft, eccentric gear, herringbone gear. ...
  •  FAW car company truck factory Komatsu E4D-800-500 double action press renovation project completed in February 15, 2007. The project uses the Japanese DeviceNet fieldbus interface OMRONCJ1GPLC, Germany BECKHOFF field bus terminal, the German P+F absolute encoder, electronic cam switch...
  • The transformation of the project equipment are: 1, an American CLEARING double moving 1300 tons of mechanical press 2, 5 American DANLY double point 500 tons of mechanical press. Transformation of the content including:] double acting 1300 tons of transformation as the single action of 800 tons;] pure gas type double cushion transformation with locking, buffering, and stroke adjustable single Coronet air cushion;] fixed.
  • The stamping line transformation of the equipment are: 1 single moving 1500 tons of multi link press 2 1 single moving multi link press 1, 3 single 500 4 tons of press, 4 single 400 tons of 4 tons of press. The transformation of the specific project are as follows:] increase the AB touch screen and] additional balancer, air cushion pressure automatic adjustment function, we realize...
  • November 18, 2009 morning, Wuhu Wei Shi Material Technology Co., Ltd. matching Chery 800 thousand car steel distribution center project launch ceremony was held in Wuhu economic and Technological Development zone. President of China Iron and Steel Association, general manager of Wuhan iron and steel (Group) Company Deng Qilin, deputy secretary of Wuhu Municipal Committee Li Meng, Municipal Standing Committee, executive..
  • Chery Automobile two high-end Japanese imported Book falling stock line relocation: contains high speed blanking press, two Japanese imports of uncoiling blanking line within 5 months to complete relocation and debugging. The implementation of the project has been highly praised the leadership of the company and Chery wuhan. Wuhan Iron and steel, Chery senior leadership and my company to participate in the production line investment...
  • FAW Jiefang automotive Komatsu 1300 tons, 1000 tons of double action press electrical transformation: the OMRONCJ1GPLC, DeviceNet field bus, digital touch screen man-machine interface, balancer, air cushion pressure, loading in mould automatic height adjustment, slider supercharger pressure proportional control; t type shift dual inverter drives.
  • SAIC GM Wuling Russia punch line overhaul, including a four point 800 tons of press, four sets of four 500 tons of Press): the OMRONCJ1GPLC, 6RA70 DC speed regulating, DeviceNet field bus, digital touch screen man-machine interface balancer, air pressure, die height, air automatic height adjustment...

免责声明: 本站资料及图片来源互联网文章,本网不承担任何由内容信息所引起的争议和法律责任。所有作品版权归原创作者所有,与本站立场无关,如用户分享不慎侵犯了您的权益,请联系我们告知,我们将做删除处理!